Central Japan Alps

Walking along the Ridge of a Mountain Range From Mt. Kiso-komagatake to Mt. Utsugi

Wakwak Group couldn't make scheduled climbing in June and August due to unusual weather. In September, they finally made it by attacking Mt. Utsugi (2,864m) after walking along the ridge of a mountain Range of Central Japan Alps. They have tried in 2002 but stopped it due to bad weather.

Red Route


First Day, September 16, 2003

As usual, they arrived at the bottom of the Senjyoujiki Cur (2,600m) by Ropeway. Within an hour, they have arrived Hoken Hut.

nokkosijydo.jpg (22370)

Looking Down Senjyojiki Curl

After the rest at the hut, they climbed Mt. Hoken.

iwaba.jpg (17598)

The Peak of Mt. Hoken

From the top of Mt. Hoken, you can see Hoken hut (blue roof) and Tengu Hut (red roof).

houkensanso.jpg (18231)

Looking down Hoken Hut from the Mt. Hoken

Second Day, September 17, 2003

After over night rest at Hoken Hut, they had started waking towards Mt. Utsugi which is visible far beyond in a clear morning air.

utugienbo.jpg (17373)

The view of Mt. Utsugi far beyond

They descended to the bottom of Senjyoujiki Curl and climbed again up to Gokuraku Daira.

curl.jpg (27499)

Senjyojiki Curl

kisokoma.jpg (18558)

from left Mt. Kisokomagatake, Mt. Nakadake, Mt. Hokendake   (photo by Mr. Kuribayashi)

From the peak of the mountain range, you can see Mt. Nigorizawa Oomine(2,724m),Mt. Hinokio(2,728m)?Mt. Otaki, Mt. Kumazawa(2,778m)  Mt. Higasikawa, Mt. Utsugi and Mt. Minamikomagatake.

range.jpg (18951)

Mountain Range of Central Japan Alps

After 11 hours and 30 minutes walk, they have arrived at Kisodono Hut. There they had a overnight rest.

Third Day, September 18, 2003

Before reaching the summit, you have to pass two steep peaks which is a mass of rocks. There is no other way than climb to come home.

summit.jpg (15713)

First Peak of Mt. Utsugi

After 2 hours and 10 minutes struggle with steep slope and rock wall they have finally stood at the summit.

peak1.jpg (16547)

Second Peak of Mt. Utsugi Viewed from the Fist Peak

After brief rest, they started descending as they still have to descend almost 2,000m in day.

kinen.jpg (12928)

at the summit of Mt. Utsugi

From the summit, they looked back the long way they had passed through yesterday.

lookingback.jpg (9466)

Looking back the mountain range which they have walked through

Under your eyes, you can see Ikeyama ridge which you have to walk down until it reaches ground level of 900m.

ikugami.jpg (22467)

Looking down Ikeyama ridge from the summit

When you look back you can see gentle shape of Mt. Utsugi.

utsugi.jpg (23320)

Looking back Mt. Utsugi from the Ikeyama ridge

They walked over 7 hours until they have arrived at the end of a car accessible road. They walked 30,000 steps in 2 days.

stone.jpg (13708)

Komaishi Stone and Mr. Greenwood (photo by Mr. Kuribayashi)

Schedule and the Performance

Date Place Scheduled Time of Arrival Actual Time Steps Height Diff. Steps/Hour
First Day JR Odawara STN 7:50 Departure 7:50      
9/16/2003 Lake Yamanaka, Central Express Way, Komagane IC          
  Sugenodai Parking  (900m) 12:00,12:40 Departure 12:12 Departure      
  Shirabi Daira 13:00        
  Senjyoujiki STN (2,600m) 14:00 13:15

0

0

0

  Hoken Hut 15:00 14:25

1,245

250

1,245

  Mt. Hoken(2,850m)          
Second Day Hoken Hut 6:00 Departure 6:15 Departure

 

  0
9/17/2003 Senjyoujiki STN 7:00 7:07

2,087

  954
  Gokurakudaira   8:00

2,565

  540
  Mt. Hinokio (2,727m), Lunch 11:30 Departure 12:00

6,747

  1,045
  Mt. Ikezawa (2,778m)   15:00      
  Kisodono Hut (2,587m) 15:30 17:30

11,865

  930
Third Day Kisodono Hut 6:00 Departure 6:00 Departure

12,293

   
9/18/2003 Mt. Utsugi(2,864m) 8:00 8:10

12,814

0

240
  Lunch   10:00      
  Shirinashi (1,970m)   13:05

21,531

-894

1,772
  Ikeyama Drinking Spot   13:45

23,868

 

3,504
  End of Ikeyama Road (1,400m)   14:50

29,377

-1,465

5,101
  Sugenodai Parking (900m) 15:00 15:20  

-1,964

 
  JR Odawara STN 20:00        

September 21, 2003

Rev. Feburuary 1, 2006


to Top Page