The individual improvement activity
In the obstruction loss of the facility overall efficiency, "the breakdown
loss" makes trouble zero by the activity of the autonomy maintenance
and the schedule maintenance.
However, it sets an item respectively and "the plan loss" "the
tool exchange loss" "the speed decline loss" "the minor
key stop loss" "the bad modification loss" "the handwork
loss" and so on must be improved.
Concretely, it measures the model line facility overall efficiency which
was set by the activity of the autonomy maintenance and it grasps loss
structure.
It decides "the individual improvement item", "the grappling
member" "the improvement plan" and "the improvement
par" on it and it develops an activity.
The way of the advance by individual improvement's activity is as follows.
Step | The active name | The active contents |
1step | The grasping of the loss which obstructs facility overall efficiency |
・ It measures the facility overall efficiency of the model line facilities. ・ It makes the obstruction loss of the overall efficiency of each of the facilities clear. ・ It puts the item of the individual improvement in order and it placards it at the active board of the model line. ・ It shows both of "the facility overall efficiency" and "the yield control for every the time" in the graph. ・ It makes a loss item table |
2step | The making of an individual improvement plan The study and training of the individual improvement means |
・ It organizes an improvement team according to the individual improvement
item and it makes an improvement plan. ・ It prepares the study and training of the improvement means and a use record according to the loss item. ・ The loss repartition is "the housekeeping exchange" "the minor key stop" "the tool exchange" "the cycle abridgment" "the bad modification" "the work time abridgment" "the work organization", "the others". ・ It makes an individual improvement plan progress table. ・ It makes a graph with individual improvement number. ・ It makes a graph with effect amount of money. |
3step | The implementation of the individual improvement | ・ It implements improvement every team. ・ It implements the report meeting of the improvement elapse regularly. ・ It placards the elapse of the improvement at the individual improvement activity board. |
4step | The announcement of the improvement result | ・ It gathers and it announces an improvement result to the improvement
case announcement meeting. ・ It puts improvement contents in the MP information in order and it issues them. ・ It makes an individual improvement report. |
5step | It makes the manual of the individual improvement. |
・ It makes the ゙ individual improvement manual ゙ which is different
from the loss, inserting an improvement case. ・ It holds an improvement training seminar in the company with ゙ improvement manual ゙. ・It expands an active object line. |
[Make it be possible to see
the loss which can not be seen].
It develops individual improvement in parallel with the autonomy maintenance
activity.Then, the loss of the facilities of the object to improve individually
must be tight grasped in the present situation.
It develops the mechanism to measure facility overall efficiency and then
it makes the obstruction loss of the facility overall efficiency every
each line clear.Moreover, it grasps the loss of the direct material and
the indirect material (the specific productivity loss) and so on.
That is, it is "to make it be possible to see the loss which can not
be seen".The loss which can be seen becomes the theme of the individual
improvement.However, the loss which can not be seen is because it doesn't
become an improvement theme.To grasp loss tight in the present situation
is to lower this surface of the water which can be seen.The leaving of
the loss which can not be seen is the problem of the management.
[Make relation between the loss structure and the factory finance value clear].
The relation between the financial value and the loss item of the factory
must be made clear.
For example, the improvement of the minor key stop loss of the obstruction
loss of the facility overall efficiency is productivity improvement of
course.When seeing this at the financial value, it is a direct labor
and moreover it concerns energy expenses, too.Also, the bad improvement
of the process is not only a direct material cost.This becomes expenses
such as "the direct labor", "the energy expenses" and
then "the expenses about the defective product disposal".
The middle plan at the factory does composition with this factory finance
value how by the improvement activity of 3 years or decides it.Then, it
sets a goal about making a factory gross profit how many %.It piles a loss
improvement item according to this goal finance value.Then, it implements
an individual improvement activity.
[Use yield control for every the time]
The writer is recommending to do yield control for every the time in parallel
with the facility overall efficiency.
The facility overall efficiency control is the average of the efficiency
in the measurement period persistently.However, as for the production line,
the yield changes every moment with the various loss every hour.The production
line is life just like.
In the seeing of the looseness of the yield every this time, the actual
state of the line can be grasped apart from the facility overall efficiency.Also,
when using the average of the yield for every the time, the relation to
the facility overall efficiency, too, can be grasped.Moreover, it becomes
a yield in one piece of time if dividing by the linear investing number
of persons.That is, it becomes an index with direct labor productivity.
In the individual improvement, it improves the factor of the looseness
of the yield for every the time.Then, it is to make the stable production
line which doesn't have looseness.It does the improvement which raises
the average of the yield for every the time in the next.
[In the right hand "The autonomy
maintenance"、In then the left hand "The individual improvement"]
The writer is saying that one "In the right hand "The autonomy
maintenance"、In then the left hand "The individual improvement"
fault is worthless.
Because, when restoring the defect of the facilities by the activity of
the autonomy maintenance, as for the defect of the minor key stop and doing
manufacture bad and so on, only the activity of the autonomy maintenance
is come to a deadlock.
Therefore, it notices the necessity to improve by analyzing tight after
grasping these in the present situation.Moreover, also, by to wrestle with
the individual improvement, it learns the structure of the facilities and
the principle of the manufacture.
Then, the defective point of view becomes deeper.It is reflected in the
activity of the autonomy maintenance.
For the result to appear in the division of the man-day of the activity
takes time fairly for the autonomy maintenance.
However, the result appears at once by implementing individual improvement
in parallel.It becomes the catchword that the whole activity of this thing
is expedited, too.
[In the big result is born the big improvement.,
it however becomes a big result if implementing a lot of small improvement,
too.]
It judges the contents of the individual improvement from "the technical
difficult degree" and "the improvement investment sum" and
so on and the period and the taking charge of the improvement are decided.
The long-range big improvement (Equal to or more than 6 months)
This is the improvement theme of the whole line.Or, the technical
difficult degree is high and is improvement contents with high improvement
investment sum.
The manager organizes a project team in the center and improves this.
The improvement during the middle (1 month-4 months)
This is the improvement of the specific process and the facilities.This
is improvement with the improvement cost of the number of which the technical
difficult degree is rather high and then it is necessary.
The supervisor and the circle improve this in the center.
The small improvement of to be short-term (The 1st-1 week)
This is specifying work and the improvement of the specific loss item.This
is the improvement that the technical difficult degree is low.
The reader and the operator improve this.
The big improvement invents a big result.Therefore, it is better to narrow
down a theme, too, and to improve.
Also, as for the small improvement, only the small result is born.Therefore,
it is necessary to solve a lot of themes to the short time.It says "that
it becomes a mountain if piled with dust" by the proverb in Japan.
[The basis of the present situation
grasping is "4W1H1F1T"].
The first step of individual improvement's beginning is the present situation
grasping.The basis of the present situation grasping is "4W1H1F1T"
What --------- "By what" "What kind"
Where --------"Where" "By the place"
Who --------- "By whom" "Which facilities"
When -------- "The when" "What time"
How ----------"How many""How much"
Frequency -----"By what frequency"
Trend ---------"What trend"
In the step of this present situation grasping, it doesn't use "why".
Especially, "When" is important about the chronic minor key stop
and the bad modification and so on.Generally, classification in "what
time" is classified as follows.
"During continuation operation" "Of plan exchange"
"Of start-up in the morning" "Behind the noon recess"
"Of working change" "Of tool exchange" "When the
minor key stops" "The others"
"What time" about "during continuation operation" is
a problem."How is it being changed from the operation beginning in
the morning in the continuation operation on the 1st?" is because
it doesn't know that it doesn't take a continuation dater.It calls this
search procedure "the way of the 1 shift continuation measurement".
Moreover, it investigates what change there is within 1 week of the weekend
from Monday.It calls this search procedure "being a way of the continuation
measurement in 1 week".
Moreover, the defective occurrence investigation by the season, too, is
sometimes necessary.That these measurement takes the measurement data of
"the temperature of the facilities" and "the temperature
of operation oil and manufacture liquid", "the temperature, the
humidity and the atmospheric pressure in the factory" in addition
to the measurement of the defective item is important.
It did detailed present situation grasping only and cause is sometimes
proved.In this case, it does at once of the measure of the cause.The necessity
and there is not an analysis having to do with an appendix.It advances
towards the factor analysis only when not finding cause.