The planned maintenance activity


The planned maintenance activity is the activity that the preservation station of the specialty builds the system which maintains facilities deliberately.
The trouble factor of the facilities is including many things.Therefore, the means which reduces trouble, too, isn't uniform.It tight does "the autonomy maintenance activity" which maintains the basis use condition of the facilities.

Then, the activity that the station of the professional maintenance does "a corrective maintenance", "a preventive maintenance", "the forecast maintenance" deliberately is necessary.Then, it analyzes the trouble which occurs at present.Then, it takes measures to prevent from the recurrence of the trouble by.
It is the basis which above activity makes reduce trouble to.Moreover, it reflects the know-how which was born with these activities in the design by the planning of the facilities.Then, it is necessary to implement early stage flow control over the facilities.
To do above activities systematically is a planned maintenance activity.

Step   The active name         The active contents
1step It corresponds to the autonomy maintenance activity
and it implements the check of
the facilities.
・ It corresponds to the autonomy maintenance activity and it checks facilities generally in the point of view of the professional maintenance.
It checks "the lubrication, the oil and air pressure, the drive, the electric control".
・ It decides the control item and the par of the plan maintenance activity.
・ It puts the rank (A,B,C) of the importance to the facilities.
・ It sets the definition of the facility trouble.
・ The control over the trouble of the preservation restoration and the manufacturing restoration, dividing it
・ It installs a plan maintenance activity board.
2step The trouble analysis and the recurrence prevention ・ It studies a way of analyzing trouble.
・ It orders the record of trouble "the facilities, the mold" which happened in 1 year of the pasts in the factory.Then, it orders according to "the number of the trouble", "the facility stop time", "the phenomenon", "the disposal", "the cause".
・ It reconsiders the record form of the trouble.(Trouble analysis-the form that the analysis can write why why)
・ It implements a trouble analysis from model facility "(the A rank)".
・ After trouble analysis, it does the measure which prevents the recurrence of the trouble, analyzing with the recurrence prevention chart.
3step ・ The making of a check, a maintenance, a standard ・ It orders the activity of 1-2 steps.
・ It enters item "(the forecast, the prevention, the improvement)" of the recurrence prevention of the trouble in "the lubricating check maintenance standard" of each of the autonomy maintenance and the professional maintenance.
Then, after checking with "the cleaning lubricating check standard" which was made with the autonomy maintenance activity 3 step, it makes "the check, the serviceable standard" of the professional maintenance.
・ Based on the check maintenance standard, it makes a month preservation calendar with the year preservation calendar.
・ It digs up the past and an estimate failure mode.
4step "Spare control"
"The control of drawings"
"The lubrication control" "The maintenance information control"
・ It arranges existing spare, ordering and it makes a spare list.
・ It reconsiders the ordering system of the spare.
・ It arranges a facility treatment manual and a drawing, ordering.
・ It investigates the kind and the busy condition of "the lubrication and operation oil" and it makes a list.
It reconsiders the unification of the kind of oil and a replenishment method.
・Moreover, it arranges an oil station.
・ It builds a personal computer input system in "the preservation record, the man-day, the occurrence expense, the schedule maintenance calendar". (Or, it reconsiders a system)
5step The diagnosis introduction of technique of the facilities
The introduction of technique of the recycling repair
・ It studies the diagnosis technique of the facilities.・ It participates in the study and training seminar of the facility diagnosis technique.
・Then, it introduces diagnosis equipment.
・ "The vibration diagnosis, the effective electric power examination, the displacement examination, the oil examination" The others
・ The effective electric power diagnostics (the ell fy) is a very effective way of the diagnosis.
・ The introduction of the recycling repair (The metal fusion weld equipment)
・ It implements facility remodeling.


[Facility breakdown and the breakdown classification]

It is as follows according to the definition with the breakdown. "The facility equipment, the part and so on lose the function of the rule with the breakdown".That is, it is in the condition that to work became normally in the function of the facilities to have.

It is classified as follows by the phenomenon of the breakdown.

@ The stall-type breakdown
This is breakdown with the function which has stopped suddenly while the facilities operate.

A The depression-type breakdown

This is breakdown with the that there is to do gradually many manufacture bad and becoming process capability of which the facilities can operate but it declines.Or, it is breakdown with the declining speed of the manufacture carriage.
It is as follows when classifying in the occurrence form of the breakdown.

@ The suddenly happening breakdown
It is the breakdown which occurs suddenly while operating without estimating at all. Then, the restoration takes time and it obstructs a production activities. That is, it is the breakdown which becomes the obstruction stop of the time operating rate in the facility overall efficiency. The schedule maintenance and in the autonomy maintenance activity, the important thing is to reduce this suddenly happening breakdown first.

A The estimated breakdown (The forecast breakdown)
The breakdown to have discovered a malfunction daily in the check and by in the fixed period facility examination, it did a deliberate restoration repair in the holiday and for it not to have given the production obstruction
However, this changes to resulting in breakdown with the degradation and there is not it. It is possible to say the trouble which restored before becoming happening breakdown suddenly. The activity of "Yellow card" to implement by the autonomy maintenance activity is the activity that will catch the abnormality of the facilities before becoming happening breakdown suddenly.
If the happening breakdown reduces substantially suddenly, next, the reduction of this estimate breakdown must be implemented.
It depends and the writer is guiding to count a number tight about this estimate breakdown, too, and to implement a breakdown analysis.
Also, it is as follows when classifying from the used hours elapse of the facilities.

@ The early stage-type breakdown

he breakdown which occurs with doing design worse, manufacturing worse's, constructiveness bad and so on in case of test run beginning of the facilities
A The occurring-type breakdown

The breakdown which occurs accidentally in the extraordinary stress and the degradation phenomenon in the early stage after entering stable operation Also, there is breakdown which occurs in case of stable operation without early stage-type breakdown measure's being sufficiently struck, too.
B The aging-type breakdown

The breakdown of which the chemical degradation such as the weariness of each part, the mechanical degradation and the oxidation, the corrosion such as the abrasion moves ahead with the long-range operation and it occurs by the factor

When classifying from the factor of the breakdown

@ The design bad type breakdown and the manufacturing construction bad type breakdown

The design bad type breakdown which occurs in the leading, not resulting in the degradation, but with part itself not doing normal operation in the mistake in case of design and lacking in the strength
Or, it is the manufacturing construction bad type breakdown which occurs in the leading with the precision not going out of the part manufacturing and the mistake at the time of the construction and lacking in the strength.
It is the trouble that the great part of the early stage-type breakdown is this type.

A The stress degradation type breakdown

The breakdown which occurs with the degradation such as operating stress "the abrasion, the nibble, the loosening, the damaging, the stretch, the crack, the oxidation, the corrosion, the heat expansion ," with all kinds

B The operation bad type breakdown

This is the breakdown which is caused by the operation mistake of the operator. These are the breakdown that the extraordinary operation which originates in the the right way of operating and plan, adjustment knowledge lack becomes cause.

[The reduction of the facility breakdown]

The breakdown factor of the facilities is including many things as the preceding clause classifies breakdown. It depends and the means which reduces breakdown, too, isn't uniform.
The three-basis pillar of the breakdown reduction is as follows.
1. The autonomy maintenance activity which does the right operation operation of the facilities, and cleaning, refueling, a check
2. The activity of the schedule maintenance by the professional maintenance subdivision (The preventive maintenance and the forecast preservation and the corrective maintenance)
3. Then, it is the activity to prevent from recurrence by analyzing the breakdown which occurs at present by.
Moreover, it is necessary to reflect the know-how which was born with these activities in the facility design.
To do above activity systematically makes breakdown reduce.


[The analysis of the facility breakdown]

As for being restoring breakdown without analyzing the cause of the facility breakdown accurately, the breakdown by the cause always recurs. Also, a measure to the similar facilities isn't made. Moreover, it isn't possible to reflect (the MP information) to the new plan facilities.
The breakdown except the early failure by doing design bad and doing the bad of the construction becomes the stress which is always. It analyzes the cause of the stress and it excludes and it reduces the stress. Or, the measure to make strong in the stress is necessary.
Of the way of finding out the cause of the actually occurring breakdown by the facility breakdown analysis Moreover, the breakdown doesn't occur in the past, but it digs up the breakdown which is expected in future and there is a way of analyzing in what cause they occur.
It writes down to this place actually about the way of analyzing occurring breakdown.

@ It is a way of analyzing breakdown why why (The single cause analysis).
This is the breakdown analysis of the stall and the outbreak. It is the analysis which arrives at the occurrence cause of the stress last, running down with why about why it occurred from the phenomenon of the breakdown and why it became it so. However, when the principle general rule of the knowledge and the manufacture, the carriage of the function structure of the facilities and so on isn't understood, the analysis sometimes comes to a deadlock why why on the way.
To study knowledge having to do with function structure, and being physical and being chemical why why in parallel in case of the implementation of the analysis is important. The analysis technique of the trouble physics becomes necessary to the investigation of the trouble part.
The recurrence prevention does the measure of the restoration and the improvement to the stress cause which was why won in the trouble analysis why.

A The way of analyzing a PM and analyzing an FTA (The compound cause analysis)
It is the trouble analysis of the depression and the minor key stop.
The breakdown of the compound factor has done a measure without finding true cause. It depends and the repeat breakdown occurs and is often chronic-izing. It does a PM analysis and an FTA analysis for these breakdown analyses.
The breakdown analysis that an analysis was why come to a deadlock why, too, uses this way.

B The way of analyzing common cause
This is different from the trouble analysis with the uniform of one. It analyzes the occurrence condition of the breakdown, and a part, a phenomenon and so on and it is the way of analyzing and doing a common measure in the common phenomenon and the cause of the part.

[The recurrence prevention of the breakdown]

For the recurrence prevention of the breakdown, prevent from the cause from the breakdown analysis which occurred to the above-mentioned actuality, recurring. Moreover, it analyzes the breakdown which is beforehand thought of and there is a way of preventing the breakdown occurrence.
The mechanism which prevents either of trouble is the same.
It should use "the list the up and the preservation method setting table of the breakdown which is thought of" and "the breakdown recurrence prevention flow figure" of the writer contrivance.
It is necessary to implement a recurrence prevention measure surely based on this "the breakdown recurrence prevention flow figure".


[Difference of the forecast maintenance and the preventive maintenance]

The maintenance method which the schedule maintenance aims at is called "the condition maintenance" (CBM).
However, all is always not a CBM from the process of the equipment. It considers both of the social influence which the maintenance expense vs. the effect and the breakdown exert and it chooses an appropriate maintenance method.
However, it is an ideal if it is possible to make the CBM system which doesn't spend money appropriately.
The basis of condition maintenance (CBM) is forecast maintenance and a preventive maintenance. The forecast and the prevention are a three-legged race and are to implement both preservation balance well.
The forecast maintenance is a check and an diagnosis. If comparing this thing to the body of the person We check whether or not it is good or whether or not it is bad in the physical condition in life in every day. hen, it is that we receive a search by the fixed period medical. This is weight measurement, blood pressure measurement, an electrocardiogram, a chest X ray, eyesight ear measurement, blood and an urine analysis and so on. It is the diagnosis whether or not the function of the body is normal or whether or not it is extraordinary.
The preventive maintenance is right operation, cleaning, refueling, increasing tightening-up, and so on. If comparing to the body of the person We are that the life, the dormancy that the rule is right, the meal that the nutritional balance came off, the exercise which is moderate, that the bathing moderate is done, the cleaning of a tooth, the bathroom, the taste amusement exclude a mental stress.
It is said to that the schedule maintenance needs facility diagnosis technique simultaneously with introduction of the TPM. Then, it lies to the acquisition of the diagnosis technique.Of course, this is a necessary thing.
However, however the degradation abnormality of the facilities can be forecast in the discovery by the facility diagnosis, the degradation can not be prevented. To prevent degradation, the preventive maintenance must be done.
Also, it is necessary to do together with the improvement maintenance to make endure degradation.

[Phase of the forecast maintenance ]

Phase 1---
It is the forecast of the malfunction in the allophone, the vibration, the generation of heat, the leakage by the five senses of the person and so on.
Phase 2---
The forecast of the malfunction with the fixed period measurement by the diagnosis equipment The vibration diagnosis, the effective electric power diagnosis, the heat diagnosis, the displacement diagnosis, the pressure diagnosis, the stress diagnosis, the insulation diagnosis, the operation oil analysis and so on
Phase 3---
It forecasts by the automatic continuation facility diagnosis by the on-line monitoring.

[The breakdown which can not be forecast is a thoroughgoing preventive maintenance].

The breakdown of the mechanical system got for the degradation forecast with being considerable in the recent facility diagnosis technique to be possible. However, the failure mode the forecast about which is difficult still is the extraordinarily depending trouble of the control circuit. It is because a computer is controlled about most of the recent facilities control. It depends and the following trouble occurs.
"Short circuit of the control basis circuit" "Doing insulation bad" "The extraordinary noise" Being "the bug on the program" and so on Especially, when becoming in the summertime, it comes across the facilities to be cooling with the electric fan by opening the door of the control board in the purpose to prevent these trouble. There should be another of something which is strange cause in this. Because it was scarce about the knowledge of the electric control, it taught the professional of the acquaintance the following and the writer got.
It is as follows when ordering from getting in it.

[Trouble factor of the control error]

1) The short-circuiting of the basis circuit
It is the error of the cause which causes short-circuiting in the time of the printed circuit of the basis and among the points of tact. It shows the factor which causes short-circuiting by the following function expression.
The fine fine particle × humidity × temperature change on the basis, the dewfall=the short-circuiting
It depends in hot and humid the summertime in Japan. and in the summertime, it is easy to mistake with the equal sign high temperature. As for the trouble of the control circuit, the humidity and the fine particle are a problem.
2) The error by the high temperature of specific CPU・IC
There is it itself in the exothermic body and moreover CPU・IC with high density is the trouble which happens with heat by fresh air in the control board added.
3) The error by the noise
It is the trouble which happens to the control circuit with the approaching by the noise from first power supply and the extraordinary electric noise from the facilities around.
4) The error by the insertion connector part insulation of the basis
It is the error the vibration of the control board loosens the insertion of the connector part of the basis and also which causes an insulation phenomenon in the corrosion by the humidity fine particle and so on.

The trouble by above factor occurs without being able to be hardly forecast. In this way, the trouble the forecast about which is difficult has no choice but to implement a thoroughgoing preventive maintenance.

[Article 7 of the control board preventive maintenance]

1) The check and the maintenance of the control board fan cooler and the sink filter …… factor The prevention of 1) and 2)
2) The control of the flow of fan air between the inside of the control board and the basis …… factor The prevention of 1) and 2)
3) The exclusion of the humidity in the control board…… factor The prevention of 1) and 4)
4) The closure and the shutting of the crack part of the control board…… factor The prevention of 1) and 4)
5) The fixed period wash by the control basis……… factor The prevention of 1)
6) It insulates a control circuit part and first power supply circuit part.And, it reconsiders the ground taking of the control circuit part. …… factor The prevention of 3)
7) The removal of the vibration occurrence source to the control board…… factor The prevention of 4)